6`1 Fireblade finished, off to the factory for tooling tomorrow!

I picked up the plug for the new 6`1 Aviso Fireblade yesterday from Cole. So stoked, the board looks amazing! It is going up to the factory tomorrow and we could be looking at the first Aviso`s coming down in about two weeks! Just in time for winter:)

6`1 passing final inspections...

6`1 passing final inspections...

6`1 Fireblade starts tooling this week!

6`1 Fireblade starts tooling this week!

The tide is super high around town this morning, but conditions are clean, so it could be fun in a little bit. There is a bit of NW windswell leftover, tide just needs to drop a little. Check back later for more shots of the new 6`1 Fireblade (Area 51)…

High tide at the beachbreaks

High tide at the beachbreaks

Still a few little peaks on tap

Still a few little peaks on tap

Share

Leave a Reply